This is an old revision of the document!
Bonus Program
Goals:
1. Improve Time Efficiency. 2. Improve Productivity. 3. Reduce Wasted Time. 4. Improve Communication.
Production Ratio
Billable Time รท Clocked Time = Production Ratio
Example:
1 billable hour / .5 clocked hour = 2
1 billable hour / 1 Clocked hour = 1
1 billable hour / 2 Clocked hours = .5
Bonus Tiers:
1st Tier 3.5pts: 35% of billed hours, less base pay.
2nd Tier 2pts: 30% of billed hours, less base pay.
3rd Tier 1pt: 20% of billed hours, less base pay.
Production Ratio:
1.75 = 2.5pts
.9 ~ 1.75 = 2pts
Clock-In On-time. 100% = 1.5pts <100% = 1pt <90% = 0pts
=== Performance requirements ===
Arrive Time
Travel Time (No Wasted Trips)
Production Time (Production ratio)
Shop Maintenance (keeping your shop clean)
3 Strike Bonus Pay Program Your individual Bonus Pay depends
Be on time
- 5 Days per Week is Expected unless prearranged in advance (min 2 days)
- Clock in for each job, clock out, and back in between major tasks on the same boat.
- Leave notes on every clock out
(Task: eg: VHF install, Supplies: 4ea 4ga Butts, etc, Driving to job site, waiting on boat, ect) - Field Technician's defined tool kit is required on each job site.
- Bring special needs tools and materials to each job as needed.
- ALL PRODUCT entering building from customers MUST BE BLUE-TAPE LABELED.
30 minutes of cleanup and 15 minutes of computer work at the end of each day End of day, prepare for tomorrow today. Before you start a job: pictures of each boat before and after each installation (uploaded to customer folder)
work efficantly Let us know if you have an issue before its a big issue Give me notice before you have to leave early (24 hours notice expected)
Shop Guidelines: keep garage clean, it should be cleaner today when you leave than it was when you arrived.